Sports hall Altdorf

Altdorf

Altdorf triple sports hall - The building is to be built on the site of the traffic training ground at the elementary school to replace the ageing school gym there.

There is a kitchen and a bar kiosk, in short: the hall can also be used for cultural or other events. The city can now hold ten to twenty major events a year in the hall. In terms of accessibility, the fact that an elevator is provided inside the hall plays an important role. The roof construction of the hall will be a wooden structure with a Domico metal element roof system. The rest of the solid construction consists of reinforced concrete columns, steel walls and steel ceilings. The complex supporting structure of the hall was designed using 3D modeling, which made it possible to overcome most of the problems (both geometric and structural) quickly and safely. We managed this project in cooperation with BAURCONSULT, which was responsible for the architecture and structural design.
No items found.