With the widening of the A6 Highway, it was deemed necessary to supplement it with an acoustic barrier that we designed.
Location
Moorenbrunn
Start of construction
Completion
Area
Length
1400 m
Weight
Use
Infrastructure
Building investor
Public
After years of stagnation, the A6 highway is being widened to six lanes between the Nuremberg East and Nuremberg South interchanges. This has consequences in terms of noise pollution along the route. The weak point of noise protection was recognized in time by the Free State of Bavaria, which commissioned the construction of a new noise barrier.